Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects

Yu-Lin Huang*, Shih Pei Chou

*此作品的通信作者

研究成果: Article同行評審

111 引文 斯高帕斯(Scopus)

摘要

The real option approach is used to value the minimum revenue guarantee (MRG) and the option to abandon in Build-Operate-Transfer infrastructure projects. The option to abandon is formulated under an investment option held by the concessionaire at contract signing and to expire before construction commencement. MRG is formulated as a series of European style put options in a single option pricing model. When combined with the option to abandon in the pre-construction phase, MRG is reconstructed as a series of European style call options to develop a compound option pricing formula. The Taiwan High-Speed Rail Project is chosen as a numerical case to apply the formulas. The results show both MRG and the option to abandon can create values. When MRG and the option to abandon are combined, they will counteract each other and their values will thus be reduced. Increasing the MRG level will decrease the value of the option to abandon, and, at a certain MRG level, the option to abandon will be rendered worthless.

原文English
頁(從 - 到)379-389
頁數11
期刊Construction Management and Economics
24
發行號4
DOIs
出版狀態Published - 4月 2006

指紋

深入研究「Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects」主題。共同形成了獨特的指紋。

引用此