Using sia and dematel to identify the factors affecting design delays

Wei-Chih Wang*, Chia Li Lin, Ming Tsung Lee

*此作品的通信作者

研究成果: Paper同行評審

摘要

Design delays can adversely affect the total completion time of a construction project. Factors affecting the delays of design duration are complicated and interrelated. This study proposes a methodology to support identify key driving factors affecting design delays and sieve out the initiating delay factors for improvement. The core of the methodology is to integrate a "satisfied importance analysis" and a "decision making trial and evaluation laboratory technique". A real-world design project in Taiwan is applied to examine the benefits of the methodology. In this case study, four first-level delay factors and 17 second-level delay subfactors are defined. The "organization's decision makings and budget constraints" is identified as the key driving factor causing design delays in this case project. Top management of the case project appreciates the application results.

原文English
頁面667-676
頁數10
出版狀態Published - 6月 2010
事件27th International Symposium on Automation and Robotics in Construction, ISARC 2010 - Bratislava, Slovakia
持續時間: 25 6月 201027 6月 2010

Conference

Conference27th International Symposium on Automation and Robotics in Construction, ISARC 2010
國家/地區Slovakia
城市Bratislava
期間25/06/1027/06/10

指紋

深入研究「Using sia and dematel to identify the factors affecting design delays」主題。共同形成了獨特的指紋。

引用此