Supporting project cost threshold decisions via a mathematical cost model

Wei-Chih Wang*

*此作品的通信作者

研究成果: Article同行評審

25 引文 斯高帕斯(Scopus)

摘要

A project cost threshold must be determined in a relatively short time by a project owner as a reference for evaluating competitive bids. In practice, such a decision is mainly based on subjective experience. This work presents a novel systematic procedure for assessing a reasonable project cost threshold. The proposed procedure involves a utility-based multi-criteria evaluation model and a cost model. The multi-criteria evaluation model is applied to accurately reflect an owner's preferences in relation to the decision criteria, as the cost model is derived to generate a cumulative cost distribution to set boundaries on the cost threshold. The proposed cost model potentially saves the computer time and coding effort that required by a simulation-based model.

原文English
頁(從 - 到)99-108
頁數10
期刊International Journal of Project Management
22
發行號2
DOIs
出版狀態Published - 1 1月 2004

指紋

深入研究「Supporting project cost threshold decisions via a mathematical cost model」主題。共同形成了獨特的指紋。

引用此