Scheduling model for multiple design projects considering uncertain design iterations

Wei-Chih Wang*, Jang Jeng Liu

*此作品的通信作者

研究成果: Conference contribution同行評審

1 引文 斯高帕斯(Scopus)

摘要

Although slightly improving the control of the design schedule may greatly reduce the total duration of the project, but little effort has been made to control the schedule of the design project. Scheduling design activities is complicated chiefly because the design activities often have different degrees of information dependencies between each other. That is, design process involves a number of iterations. This work develops a simulation-based model to incorporate uncertain design iterations for generating the schedule of multiple design projects for a design firm. The proposed model is implemented and demonstrated by a case study.

原文English
主出版物標題Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction
頁面447-452
頁數6
DOIs
出版狀態Published - 2007
事件24th International Symposium on Automation and Robotics in Construction, ISARC 2007 - Kochi, 印度
持續時間: 19 9月 200721 9月 2007

出版系列

名字Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction

Conference

Conference24th International Symposium on Automation and Robotics in Construction, ISARC 2007
國家/地區印度
城市Kochi
期間19/09/0721/09/07

指紋

深入研究「Scheduling model for multiple design projects considering uncertain design iterations」主題。共同形成了獨特的指紋。

引用此