Robust scheduling on a single machine to minimize total flow time

Chung-Cheng Lu, Shih Wei Lin, Kuo Ching Ying*

*此作品的通信作者

研究成果: Article同行評審

74 引文 斯高帕斯(Scopus)

摘要

In a real-world manufacturing environment featuring a variety of uncertainties, production schedules for manufacturing systems often cannot be executed exactly as they are developed. In these environments, schedule robustness that guarantees the best worst-case performance is a more appropriate criterion in developing schedules, although most existing studies have developed optimal schedules with respect to a deterministic or stochastic scheduling model. This study concerns robust single machine scheduling with uncertain job processing times and sequence-dependent family setup times explicitly represented by interval data. The objective is to obtain robust sequences of job families and jobs within each family that minimize the absolute deviation of total flow time from the optimal solution under the worst-case scenario. We prove that the robust single machine scheduling problem of interest is NP-hard. This problem is reformulated as a robust constrained shortest path problem and solved by a simulated annealing-based algorithmic framework that embeds a generalized label correcting method. The results of numerical experiments demonstrate that the proposed heuristic is effective and efficient for determining robust schedules. In addition, we explore the impact of degree of uncertainty on the performance measures and examine the tradeoff between robustness and optimality.

原文English
頁(從 - 到)1682-1691
頁數10
期刊Computers and Operations Research
39
發行號7
DOIs
出版狀態Published - 1 7月 2012

指紋

深入研究「Robust scheduling on a single machine to minimize total flow time」主題。共同形成了獨特的指紋。

引用此