Relocation scheduling subject to fixed processing sequences

Bertrand M.T. Lin*, F. J. Hwang, Alexander V. Kononov

*此作品的通信作者

研究成果: Article同行評審

8 引文 斯高帕斯(Scopus)

摘要

This study addresses a relocation scheduling problem that corresponds to resource-constrained scheduling on two parallel dedicated machines where the processing sequences of jobs assigned to the machines are given and fixed. Subject to the resource constraints, the problem is to determine the starting times of all jobs for each of the six considered regular performance measures, namely, the makespan, total weighted completion time, maximum lateness, total weighted tardiness, weighted number of tardy jobs, and number of tardy jobs. By virtue of the proposed dynamic programming framework, the studied problem for the minimization of makespan, total weighted completion time, or maximum lateness can be solved in (Formula presented.) time, where (Formula presented.) and (Formula presented.) are the numbers of jobs on the two machines. The simplified case with a common job processing time can be solved in (Formula presented.) time. For the objective function of total weighted tardiness or weighted number of tardy jobs, this problem is proved to be NP-hard in the ordinary sense, and the case with a common job processing length is solvable in (Formula presented.) time. The studied problem for the minimization of number of tardy jobs is solvable in (Formula presented.) time. The solvability of the common-processing-time problems can be generalized to the m-machine cases, where (Formula presented.).

原文English
頁(從 - 到)153-163
頁數11
期刊Journal of Scheduling
19
發行號2
DOIs
出版狀態Published - 4月 2016

指紋

深入研究「Relocation scheduling subject to fixed processing sequences」主題。共同形成了獨特的指紋。

引用此