摘要
At SRRC, a precision output current monitoring system is installed to monitor the output performance of all the booster/storage ring power supplies. Accurate DC current transformers (DCCTs) are attached to the output terminal of every power supply system. Each transformer's gain/offset are carefully calibrated against high precision current source and approximated using high-order polynomial curve fitting. The output of each DCCT is connected to multi-channels data logger for real-time data collection, the collected data are calibrated using the interpolated DCCT gain/offset value. A PC station is set up to serve as host to store the current output for real-time monitoring. This monitoring system provide a precise real-time database for rapid fault diagnosing whenever there is malfunction of the beam operation.
原文 | English |
---|---|
頁面 | 3690-3692 |
頁數 | 3 |
DOIs | |
出版狀態 | Published - 2001 |
事件 | 2001 Particle Accelerator Conference - Chicago, IL, 美國 持續時間: 18 6月 2001 → 22 6月 2001 |
Conference
Conference | 2001 Particle Accelerator Conference |
---|---|
國家/地區 | 美國 |
城市 | Chicago, IL |
期間 | 18/06/01 → 22/06/01 |