Minimizing the total weighted completion time in relocation scheduling

Yi Chen Su, Bertrand M.T. Lin*

*此作品的通信作者

研究成果: Article同行評審

摘要

This study investigates a resource-constrained scheduling problem to minimize the total weighted completion time. A set of jobs is to be processed on a single machine subject to the limited availability of a single-type resource. An initial level of the resource is provided to support the processing of the jobs. Each job requires an amount of the resource to commence its processing, and returns an amount of the resource back to the resource pool when its processing is finished. The amount of the resource consumed and that returned by each job may not be identical. Minimizing the total weighted completion time under this resource-constraint setting is known to be strongly NP-hard. In this study, we propose several optimality dominance properties, a lower bound and two approximate bounds for developments of branch-and-bound-based approximation algorithms. Heuristic algorithms and subsequent improvement procedures are deployed to produce initial upper bounds for the branch-and-bound-based approximation algorithms. We conduct computational experiments to appraise the performance of the proposed properties and algorithms.

原文English
文章編號108662
期刊Computers and Industrial Engineering
173
DOIs
出版狀態Published - 11月 2022

指紋

深入研究「Minimizing the total weighted completion time in relocation scheduling」主題。共同形成了獨特的指紋。

引用此