Factor-based path analysis to support subcontractor management

Wei-Chih Wang*, Jang Jeng Liu

*此作品的通信作者

研究成果: Article同行評審

10 引文 斯高帕斯(Scopus)

摘要

Current practice separates subcontractor management from schedule control. A factor-based model is proposed to measure the sensitivity of each factor to uncertainty by decomposing the effects of uncertainty at the level of activity, and then integrating these individual effects at the path level. By viewing the path of a schedule network as the working route of one or several subcontractors, the proposed model enhances knowledge of what to control on each subcontractor, such as those factors that a subcontractor is sensitive to, and the subcontractors that are most sensitive to a particular factor. Consequently, a project delay is averted. And management can control subcontractors and the schedule in an integrated manner.

原文English
頁(從 - 到)109-120
頁數12
期刊International Journal of Project Management
23
發行號2
DOIs
出版狀態Published - 1 2月 2005

指紋

深入研究「Factor-based path analysis to support subcontractor management」主題。共同形成了獨特的指紋。

引用此