跳至主導覽 跳至搜尋 跳過主要內容

Delay Analysis in Closed-Loop EEG Phase-Triggered Transcranial Magnetic Stimulation

  • Yu Cheng Chang
  • , Pin Hsuan Chao
  • , Yan Ming Kuan
  • , Chiu Jung Huang
  • , Li Fen Chen
  • , Wei Chung Mao
  • , Tung Ping Su
  • , Sin Horng Chen
  • , Chun Shu Wei*
  • *此作品的通信作者

研究成果: Conference contribution同行評審

3 引文 斯高帕斯(Scopus)

摘要

The recent development of closed-loop EEG phase-triggered transcranial magnetic stimulation (TMS) has advanced potential applications of adaptive neuromodulation based on the current brain state. Closed-loop TMS involves instantaneous acquisition of the EEG rhythm, timing prediction of the target phase, and triggering of TMS. However, the accuracy of EEG phase prediction algorithms is largely influenced by the system's transport delay, and their relationship is rarely considered in related work. This paper proposes a delay analysis that considers the delay of the closed-loop EEG phase-triggered TMS system as a primary factor in the validation of phase prediction algorithms. An in-silico validation using real EEG data was performed to compare the performance of commonly used algorithms. The experimental results indicate a significant influence of the total delay on the algorithm performance, and the performance ranking among algorithms varies at different levels of delay. We conclude that the delay analysis framework should be widely adopted in the design and validation of phase prediction algorithms for closed-loop EEG phase-triggered TMS systems.

原文English
主出版物標題2023 45th Annual International Conference of the IEEE Engineering in Medicine and Biology Conference, EMBC 2023 - Proceedings
發行者Institute of Electrical and Electronics Engineers Inc.
ISBN(電子)9798350324471
DOIs
出版狀態Published - 2023
事件45th Annual International Conference of the IEEE Engineering in Medicine and Biology Conference, EMBC 2023 - Sydney, 澳大利亞
持續時間: 24 7月 202327 7月 2023

出版系列

名字Proceedings of the Annual International Conference of the IEEE Engineering in Medicine and Biology Society, EMBS
ISSN(列印)1557-170X

Conference

Conference45th Annual International Conference of the IEEE Engineering in Medicine and Biology Conference, EMBC 2023
國家/地區澳大利亞
城市Sydney
期間24/07/2327/07/23

指紋

深入研究「Delay Analysis in Closed-Loop EEG Phase-Triggered Transcranial Magnetic Stimulation」主題。共同形成了獨特的指紋。

引用此