原文 | American English |
---|---|
期刊 | Engineering Optimization |
出版狀態 | Published - 2019 |
Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work
Jacek Błażewicz, Xin Chen, R. C.T. Lee, Bertrand Miao-Tsong Lin, Feng-Cheng Lin, Erwin Pesch, Malgorzata Sterna, Zhongyu Wang
研究成果: Article › 同行評審