TY - JOUR
T1 - Applying the AHP to support the best-value contractor selection-lessons learned from two case studies in Taiwan
AU - Wang, Wei-Chih
AU - Yu, Wen Der
AU - Yang, I. Tung
AU - Lin, Chun Chang
AU - Lee, Ming Tsung
AU - Cheng, Yuan Yuan
PY - 2013/2/1
Y1 - 2013/2/1
N2 - Lately the Best-Value (BV) method for contractor selection has been receiving considerable attention in the public sector in many countries. However, the operations used in performing the BV method often differ due to the various government procurement requirements. Consequently, some of the methods popular in the academic community are not easily incorporated in the BV method in some countries. To enhance the procurement process, this study aims to gain experience by applying the well-known analytical hierarchy process (AHP) to weight the decision criteria for selecting BV contractors of two construction projects in Taiwan. Through these two case studies, this work confirms that the AHP provides a significant benefit for considering the individual preferences of all decision-makers when weighting the criteria. However, this study finds two major potential obstacles, the legal requirements associated with using the AHP and the time it takes to implement the AHP. To overcome these obstacles, this work suggests guidelines to meet the legal requirements for implementing the AHP in the BV contractor selection, and proposes several strategies to shorten the AHP implementation time. The lessons learned here are relevant to those countries in which BV method must be performed in a transparent and strictly regulated environment.
AB - Lately the Best-Value (BV) method for contractor selection has been receiving considerable attention in the public sector in many countries. However, the operations used in performing the BV method often differ due to the various government procurement requirements. Consequently, some of the methods popular in the academic community are not easily incorporated in the BV method in some countries. To enhance the procurement process, this study aims to gain experience by applying the well-known analytical hierarchy process (AHP) to weight the decision criteria for selecting BV contractors of two construction projects in Taiwan. Through these two case studies, this work confirms that the AHP provides a significant benefit for considering the individual preferences of all decision-makers when weighting the criteria. However, this study finds two major potential obstacles, the legal requirements associated with using the AHP and the time it takes to implement the AHP. To overcome these obstacles, this work suggests guidelines to meet the legal requirements for implementing the AHP in the BV contractor selection, and proposes several strategies to shorten the AHP implementation time. The lessons learned here are relevant to those countries in which BV method must be performed in a transparent and strictly regulated environment.
KW - analytical hierarchy process
KW - best-value tendering method
KW - case study
KW - contractor selection
KW - multiple criteria evaluations
UR - http://www.scopus.com/inward/record.url?scp=84872962373&partnerID=8YFLogxK
U2 - 10.3846/13923730.2012.734851
DO - 10.3846/13923730.2012.734851
M3 - Article
AN - SCOPUS:84872962373
SN - 1392-3730
VL - 19
SP - 24
EP - 36
JO - Journal of Civil Engineering and Management
JF - Journal of Civil Engineering and Management
IS - 1
ER -