Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times

Shih Wei Lin, Kuo Ching Ying*, Chung-Cheng Lu, Jatinder N.D. Gupta

*此作品的通信作者

研究成果: Article同行評審

36 引文 斯高帕斯(Scopus)

摘要

Meta-heuristics that attempt to obtain (near) global optimal solutions of NP-hard combinatorial optimization problems generally require diversification to escape from local optimality. One way to achieve diversification is to utilize the multi-start hill climbing strategy. By combining the respective advantages of the multi-start hill climbing strategy and simulated annealing (SA), an effective multi-start simulated annealing (MSA) heuristic is proposed to minimize the makespan for a flowline manufacturing cell scheduling problem with sequence dependent family setup times. The heuristic performance is evaluated by comparing the results achieved by the proposed heuristic with those achieved by the existing meta-heuristics. The computational results show that following multi-start refinement the proposed MSA heuristic is more effective compared to the state-of the-art meta-heuristics on the same benchmark instances.

原文English
頁(從 - 到)246-254
頁數9
期刊International Journal of Production Economics
130
發行號2
DOIs
出版狀態Published - 4月 2011

指紋

深入研究「Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times」主題。共同形成了獨特的指紋。

引用此