A machine setup model for TFT-LCD cell back-end process

Yung-Chia Chang*, P. S. Chen, P. C. Chen

*此作品的通信作者

研究成果: Conference contribution同行評審

1 引文 斯高帕斯(Scopus)

摘要

The cell process is the main part of thin-film transistor liquid-crystal display (TFT-LCD), and can be divided into front-end process and back-end process. Since the production machines of the cell process are the critical resources, maximizing the machine utilization and minimizing the loss of capacity become the major concern for production planning. This research studies the scheduling of machine setups in scribing and breaking station and in testing station (so called the cell back-end process). A customized machine-setup decision support system is proposed to assist shop-floor workers in the backend process scribing and breaking station and testing station of a 5th generation TFT-LCD production facility to determine an appropriate timing to set up machines. Through a simulation study, it is found that the throughput of the proposed schedule and the machine setup effort in the bottleneck station are both outperformed the ones obtained by current methods employed in this facility.

原文English
主出版物標題IEEM 2009 - IEEE International Conference on Industrial Engineering and Engineering Management
頁面1709-1713
頁數5
DOIs
出版狀態Published - 1 12月 2009
事件IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2009 - Hong Kong, China
持續時間: 8 12月 200911 12月 2009

出版系列

名字IEEM 2009 - IEEE International Conference on Industrial Engineering and Engineering Management

Conference

ConferenceIEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2009
國家/地區China
城市Hong Kong
期間8/12/0911/12/09

指紋

深入研究「A machine setup model for TFT-LCD cell back-end process」主題。共同形成了獨特的指紋。

引用此