    Establishing construction scheduling progress curve based on buidling information modeling quantity takeoffs

    Wang, K. C., Wu, W. H., Hsu, P. Y., Gansonre, A. A., Wang, W-C. & Kung, C. J., 1 1月 2015, ICSOFT-EA 2015 - 10th International Conference on Software Engineering and Applications, Proceedings; Part of 10th International Joint Conference on Software Technologies, ICSOFT 2015. Lorenz, P., Maciaszek, L. & Maciaszek, L. (編輯). SciTePress, p. 139-144 6 p. (ICSOFT-EA 2015 - 10th International Conference on Software Engineering and Applications, Proceedings; Part of 10th International Joint Conference on Software Technologies, ICSOFT 2015).

    研究成果: Conference contribution同行評審

  • 2014

    Application of building information modeling in designing fire evacuation-a case study

    Wang, K. C., Shih, S. Y., Chan, W. S., Wang, W-C., Wang, S. H., Gansonre, A. A., Liu, J. J., Lee, M. T., Cheng, Y. Y. & Yeh, M. F., 7月 2014, 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. Ha, Q., Akbarnezhad, A. & Shen, X. (編輯). University of Technology Sydney, p. 593-601 9 p. (31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings).

    研究成果: Conference contribution同行評審

    17 引文 斯高帕斯(Scopus)
  • Developing an ontology-based representation framework for establishing cost analysis knowledge base for construction work items

    Wang, H. H., Weng, S. W., Gansonre, A. A. & Wang, W-C., 7月 2014, 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. Ha, Q., Akbarnezhad, A. & Shen, X. (編輯). University of Technology Sydney, p. 377-384 8 p. (31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings).

    研究成果: Conference contribution同行評審

    1 引文 斯高帕斯(Scopus)
  • Model for evaluating uncertain project duration considering construction interface problems

    Wang, S. H., Lai, Y. T., Liu, J. J. & Wang, W-C., 1 1月 2014, Applied Science and Precision Engineering Innovation. p. 1160-1169 10 p. (Applied Mechanics and Materials; 卷 479-480).

    研究成果: Conference contribution同行評審

  • 2008

    Evaluating the effect of multiple factors on unit prices for supporting bid price decisions

    Wang, W-C., Hsu, C. H., Wang, S. S. & Lin, C. C., 1 12月 2008, Proceedings of the 6th International Conference on Engineering Computational Technology. (Proceedings of the 6th International Conference on Engineering Computational Technology).

    研究成果: Conference contribution同行評審

  • 2007

    Scheduling model for multiple design projects considering uncertain design iterations

    Wang, W-C. & Liu, J. J., 1 12月 2007, Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction. p. 447-452 6 p. (Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction).

    研究成果: Conference contribution同行評審

    1 引文 斯高帕斯(Scopus)
  • 2005

    Bid-price determination considering cash-flow effects

    Wang, W-C., Lin, C. L. & Lu, Y. H., 8月 2005, Proceedings of the 10th International Conference on Civil, Structural and Environmental Engineering Computing, Civil-Comp 2005. 15 p. (Proceedings of the 10th International Conference on Civil, Structural and Environmental Engineering Computing, Civil-Comp 2005).