Abstract
Solving resource-constrained (RC) project scheduling problems is one the most important tasks in the project planning process. This study presents a new hybrid approach, named Artificial Bee Colony with Differential Evolution, to handle resource-constrained problems (ABCDE-RC). The proposed algorithm integrates crossover operations from differential evolution (DE) with original artificial bee colony (ABC) to balance exploration and exploitation phases of the optimization process. Furthermore, this study applies a serial method to reflect individual-vector priorities into the active schedule to calculate project duration. The ABCDE-RC algorithm is compared with benchmark algorithms considered using a real construction case study and a set of standard problem available in the literature. The experimental results demonstrate the efficiency and effectiveness of the proposed model. The ABCDE-RC is a promising alternative approach to handling resource-constrained project scheduling problems.
| Original language | English |
|---|---|
| Article number | 04015065 |
| Journal | Journal of Computing in Civil Engineering |
| Volume | 30 |
| Issue number | 4 |
| DOIs | |
| State | Published - 1 Jul 2016 |
Keywords
- Artificial bee colony
- Construction management
- Differential evolution
- Resource-constrained