Simulation-based scheduling model for multiple design projects

Jang Jeng Liu*, Wei-Chih Wang

*Corresponding author for this work

Research output: Contribution to conferencePaperpeer-review

3 Scopus citations

Abstract

A design firm often needs to allocate various types of design resources or participants to the multi-disciplinary activities of various design projects. Each of these design projects is undertaken either in a proposal phase, basic design phase, detailed design phase, or construction phase of a building project. Effective allocation of the design participants to activities depends on how the design activities of these design projects are scheduled. But the effect which is caused by design iterations in schedule and resource isn't considered before. This study finds design iterations by DSM and other methods and develops a simulation-based scheduling model to effective allocate design participants to multiple design projects under the effect of design iteration. This model is helpful to find how to lean the design schedule and design resources. Particularly, simulation algorithms are proposed to model the uncertainties of design iterations, draw amounts of iterations, design participants' man hour, and activity durations. The operation of the model is demonstrated by applying it to a Taiwanese design firm who deals with multiple design projects.

Original languageEnglish
Pages523-532
Number of pages10
StatePublished - 2009
Event17th Annual Conference of the International Group for Lean Construction, IGLC17 - Taipei, Taiwan
Duration: 13 Jul 200919 Jul 2009

Conference

Conference17th Annual Conference of the International Group for Lean Construction, IGLC17
Country/TerritoryTaiwan
CityTaipei
Period13/07/0919/07/09

Keywords

  • Design iteration
  • Design process
  • Design schedule
  • Multi-project
  • Simulation

Fingerprint

Dive into the research topics of 'Simulation-based scheduling model for multiple design projects'. Together they form a unique fingerprint.

Cite this