Reliability of spare routing via intersectional minimal paths within budget and time constraints by simulation

Yi Kuei Lin, Cheng Fu Huang*, Chin Chia Chang

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

7 Scopus citations

Abstract

A stochastic flow network composed of multistate arcs can be utilized to describe several practical systems such as computer networks, where transmission time taken for sending data to a sink is an important index. Determining a path with minimum transmission time is known as the quickest path problem (QPP). All algorithms addressing the QPP assume that the determined minimal paths (MPs) are disjoint. Further, for the general case of intersectional MPs, if a congestion phenomenon occurs during the transmission process, these algorithms will lead to an incorrect outcome. Moreover, in practical scenarios, as a budget limit is considered, spare routing is applied to consolidate the system. The objective is to develop an algorithm based on Monte Carlo simulations (MCSs) for evaluating the system reliability while considering the congestion phenomenon. The system reliability is the probability that a specific amount of data can be transmitted successfully through multiple MPs under both time and budget constraints. Furthermore, spare routing to increase the system reliability is established in advance to specify the main and spare MPs. Experiments validate the evaluation of system reliability based on MCSs. The credibility and efficiency of the proposed algorithm are also discussed.

Original languageEnglish
Number of pages24
JournalAnnals of Operations Research
DOIs
StateE-pub ahead of print - Jan 2021

Keywords

  • Budget
  • Intersectional minimal paths
  • Monte Carlo simulation
  • Reliability
  • Spare routing

Fingerprint

Dive into the research topics of 'Reliability of spare routing via intersectional minimal paths within budget and time constraints by simulation'. Together they form a unique fingerprint.