Model for evaluating uncertain project duration considering construction interface problems

Shih Hsu Wang, Yu Ting Lai, Jang Jeng Liu, Wei-Chih Wang

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Many probabilistic scheduling models have been developed to determine the duration of construction projects. However, these models are not appropriate to capture the effect of the factors that are involved construction interface problems on the durations of multiple activities. This work presents a simulation-based probabilistic scheduling model that includes the impact of construction interface problems on the duration of building projects. The proposed model is established according to an activity duration model and a work-group (WG)-based schedule network. The activity duration model is applied to reflect the effects of "general factors" on the duration of each activity; the WG-based schedule network is employed to evaluate the effects of construction interface problems on the durations of multiple activities. The results of applying the proposed model to an example project reveal that the duration of a project can be over-optimistically estimated if the effects of construction interface problems are neglected.

Original languageEnglish
Title of host publicationApplied Science and Precision Engineering Innovation
Pages1160-1169
Number of pages10
DOIs
StatePublished - 1 Jan 2014
EventInternational Applied Science and Precision Engineering Conference 2013, ASPEC 2013 - NanTou, Taiwan
Duration: 18 Oct 201322 Oct 2013

Publication series

NameApplied Mechanics and Materials
Volume479-480
ISSN (Print)1660-9336
ISSN (Electronic)1662-7482

Conference

ConferenceInternational Applied Science and Precision Engineering Conference 2013, ASPEC 2013
Country/TerritoryTaiwan
CityNanTou
Period18/10/1322/10/13

Keywords

  • Construction interface
  • Probabilistic scheduling
  • Schedule risk management
  • Simulation
  • Uncertain duration

Fingerprint

Dive into the research topics of 'Model for evaluating uncertain project duration considering construction interface problems'. Together they form a unique fingerprint.

Cite this