Skip to main navigation Skip to search Skip to main content

Delay Analysis in Closed-Loop EEG Phase-Triggered Transcranial Magnetic Stimulation

  • Yu Cheng Chang
  • , Pin Hsuan Chao
  • , Yan Ming Kuan
  • , Chiu Jung Huang
  • , Li Fen Chen
  • , Wei Chung Mao
  • , Tung Ping Su
  • , Sin Horng Chen
  • , Chun Shu Wei*
  • *Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

3 Scopus citations

Abstract

The recent development of closed-loop EEG phase-triggered transcranial magnetic stimulation (TMS) has advanced potential applications of adaptive neuromodulation based on the current brain state. Closed-loop TMS involves instantaneous acquisition of the EEG rhythm, timing prediction of the target phase, and triggering of TMS. However, the accuracy of EEG phase prediction algorithms is largely influenced by the system's transport delay, and their relationship is rarely considered in related work. This paper proposes a delay analysis that considers the delay of the closed-loop EEG phase-triggered TMS system as a primary factor in the validation of phase prediction algorithms. An in-silico validation using real EEG data was performed to compare the performance of commonly used algorithms. The experimental results indicate a significant influence of the total delay on the algorithm performance, and the performance ranking among algorithms varies at different levels of delay. We conclude that the delay analysis framework should be widely adopted in the design and validation of phase prediction algorithms for closed-loop EEG phase-triggered TMS systems.

Original languageEnglish
Title of host publication2023 45th Annual International Conference of the IEEE Engineering in Medicine and Biology Conference, EMBC 2023 - Proceedings
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9798350324471
DOIs
StatePublished - 2023
Event45th Annual International Conference of the IEEE Engineering in Medicine and Biology Conference, EMBC 2023 - Sydney, Australia
Duration: 24 Jul 202327 Jul 2023

Publication series

NameProceedings of the Annual International Conference of the IEEE Engineering in Medicine and Biology Society, EMBS
ISSN (Print)1557-170X

Conference

Conference45th Annual International Conference of the IEEE Engineering in Medicine and Biology Conference, EMBC 2023
Country/TerritoryAustralia
CitySydney
Period24/07/2327/07/23

Fingerprint

Dive into the research topics of 'Delay Analysis in Closed-Loop EEG Phase-Triggered Transcranial Magnetic Stimulation'. Together they form a unique fingerprint.

Cite this