Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work

Jacek Błażewicz, Xin Chen, Richard C.T. Lee, Bertrand M.T. Lin*, Feng Cheng Lin, Erwin Pesch, Malgorzata Sterna, Zhongyu Wang

*Corresponding author for this work

Research output: Contribution to journalEditorial

6 Scopus citations
Original languageEnglish
Pages (from-to)1279-1280
Number of pages2
JournalEngineering Optimization
Volume51
Issue number7
DOIs
StatePublished - Jul 2019

Cite this