Original language | English |
---|---|
Pages (from-to) | 1279-1280 |
Number of pages | 2 |
Journal | Engineering Optimization |
Volume | 51 |
Issue number | 7 |
DOIs | |
State | Published - Jul 2019 |
Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work
Jacek Błażewicz, Xin Chen, Richard C.T. Lee, Bertrand M.T. Lin*, Feng Cheng Lin, Erwin Pesch, Malgorzata Sterna, Zhongyu Wang
*Corresponding author for this work
Research output: Contribution to journal › Editorial
6
Scopus
citations