TY - GEN
T1 - Building a temporary VM-based testing subsystem for evaluating the validity of a hybrid SSL-VPN system
AU - Chen, Chang-Sheng
AU - Lin, Ming Hua
PY - 2013/10/22
Y1 - 2013/10/22
N2 - In this paper, we proposed to build a temporary testing system with virtual machine (VM) technology for studying the performance issues (e.g., number of sessions, load-sharing mechanism) and the availability of a newly built hybrid SSL-VPN system before rolling out the service. Moreover, we had designed testing cases to help locate the configuration bugs and/or improper settings, and use them as guidelines for re-adjusting the system configuration to meet the design considerations. As shown in the paper, using the VM technology helps make both the deployment and the test of the SSL-VPN service to become more effective (e.g., easier to reconfigure the system, more scalable).
AB - In this paper, we proposed to build a temporary testing system with virtual machine (VM) technology for studying the performance issues (e.g., number of sessions, load-sharing mechanism) and the availability of a newly built hybrid SSL-VPN system before rolling out the service. Moreover, we had designed testing cases to help locate the configuration bugs and/or improper settings, and use them as guidelines for re-adjusting the system configuration to meet the design considerations. As shown in the paper, using the VM technology helps make both the deployment and the test of the SSL-VPN service to become more effective (e.g., easier to reconfigure the system, more scalable).
KW - Load-sharing
KW - SSL-VPN
KW - Session
KW - Testing cases
KW - Virtual machine technology
UR - http://www.scopus.com/inward/record.url?scp=84885779238&partnerID=8YFLogxK
U2 - 10.4028/www.scientific.net/AMM.373-375.833
DO - 10.4028/www.scientific.net/AMM.373-375.833
M3 - Conference contribution
AN - SCOPUS:84885779238
SN - 9783037858066
T3 - Applied Mechanics and Materials
SP - 833
EP - 837
BT - Mechatronics, Robotics and Automation
T2 - 2013 International Conference on Mechatronics, Robotics and Automation, ICMRA 2013
Y2 - 13 June 2013 through 14 June 2013
ER -