Projects per year
Projects
- 20 Finished
Search results
-
Finished
Estimation of Nonconformity Parts Per Million (NCPPM) for Etching Processes in the Manufacturing Industry
Pearn, W. L. (PI)
1/08/23 → 31/07/24
Project: Government Ministry › Other Government Ministry Institute
-
Estimation of Nonconformity Parts Per Million (NCPPM) for Etching Processes in the Manufacturing Industry
Pearn, W. L. (PI)
1/08/22 → 31/07/23
Project: Government Ministry › Other Government Ministry Institute
-
Estimation of Nonconformity Parts Per Million (NCPPM) for Etching Processes in the Manufacturing Industry
Pearn, W. L. (PI)
1/08/21 → 31/07/22
Project: Government Ministry › Other Government Ministry Institute
-
Operating Characteristics and Optimization Analysis of a Retrial System with Reserving Blocks of Servers and Nonhomogeneous Service Rates
Pearn, W. L. (PI)
1/08/20 → 31/07/21
Project: Government Ministry › Other Government Ministry Institute
-
Operating Characteristics and Optimization Analysis of a Retrial System with Reserving Blocks of Servers and Nonhomogeneous Service Rates
Pearn, W. L. (PI)
1/08/19 → 31/07/20
Project: Government Ministry › Other Government Ministry Institute
-
Operating Characteristics and Optimization Analysis of a Retrial System with Reserving Blocks of Servers and Nonhomogeneous Service Rates
Pearn, W. L. (PI)
1/08/18 → 31/07/19
Project: Government Ministry › Other Government Ministry Institute
-
Optimization of Queueing Systems for Multiple Servers with Starting Failure
Pearn, W. L. (PI)
1/08/17 → 31/07/18
Project: Government Ministry › Other Government Ministry Institute
-
Optimization of Queueing Systems for Multiple Servers with Starting Failure
Pearn, W. L. (PI)
1/08/16 → 31/07/17
Project: Government Ministry › Other Government Ministry Institute
-
Optimization of Queueing Systems for Multiple Servers with Starting Failure
Pearn, W. L. (PI)
1/08/15 → 31/07/16
Project: Government Ministry › Other Government Ministry Institute
-
Optimization of A Queueing System With Partial/Working Breakdown, Balking, Reneging And Single Vacation Policy
Pearn, W. L. (PI)
1/08/14 → 31/07/15
Project: Government Ministry › Other Government Ministry Institute
-
Operating Characteristics Analysis and Optimal Control of the M/M/S Queueing System with Unreliable Servers and Controllable Repair Policy
Pearn, W. L. (PI)
1/08/13 → 31/07/14
Project: Government Ministry › Other Government Ministry Institute
-
Optimal Management of the M/M/S Machine Repair System with Synchronous Vacation Policy and Multiple Threshold
Pearn, W. L. (PI)
1/08/12 → 31/07/13
Project: Government Ministry › Other Government Ministry Institute
-
Optimal Management of the M/M/S Machine Repair System with Synchronous Vacation Policy and Multiple Threshold
Pearn, W. L. (PI)
1/08/11 → 31/07/12
Project: Government Ministry › Other Government Ministry Institute
-
Optimization Analysis of the Multi-server Queue with Second Optional Channel
Pearn, W. L. (PI)
1/08/11 → 31/07/12
Project: Government Ministry › Other Government Ministry Institute
-
Optimal Management of the M/M/S Machine Repair System with Synchronous Vacation Policy and Multiple Threshold
Pearn, W. L. (PI)
1/08/10 → 31/07/11
Project: Government Ministry › Other Government Ministry Institute
-
Optimization Analysis of the Multi-server Queue with Second Optional Channel
Pearn, W. L. (PI)
1/08/10 → 31/07/11
Project: Government Ministry › Other Government Ministry Institute
-
Optimization Analysis of the Multi-server Queue with Second Optional Channel
Pearn, W. L. (PI)
1/08/09 → 31/07/10
Project: Government Ministry › Other Government Ministry Institute
-
在排隊系統裡控制到達與控制服務之理論與實務應用研究-子計畫一:探討有限容量F方策M/G/3排隊系統之操作特性與敏感度分析(3/3)
Pearn, W. L. (PI)
1/08/09 → 31/07/10
Project: Government Ministry › Other Government Ministry Institute
-
在排隊系統裡控制到達與控制服務之理論與實務應用研究-子計畫一:探討有限容量F方策M/G/2排隊系統之操作特性與敏感度分析(2/3)
Pearn, W. L. (PI)
1/08/08 → 31/07/09
Project: Government Ministry › Other Government Ministry Institute
-
應用六倍標準差方法評估製程在變異數會變動情況下的製程能力(I)
Pearn, W. L. (PI)
1/08/08 → 31/07/09
Project: Government Ministry › Other Government Ministry Institute