Keyphrases
Process Capability Index
100%
Manufacturing Industry
51%
Capability Index
49%
Process Capability
45%
Lower Confidence Bound
40%
Process Performance
39%
Process Yield
39%
Supplier Selection
38%
Multiple Characteristics
35%
Production Yield
32%
Natural Estimator
30%
Queueing System
29%
Asymmetric Tolerances
29%
Capability Requirements
28%
Testing Process
28%
Yield Index
28%
Manufacturing Process
27%
Measuring Process
27%
Fraction of Defectives
26%
Scheduling Problem
24%
Statistical Properties
23%
Start-up Time
22%
Second Optional Service
19%
Process Precision
19%
Popular
19%
Multiple Samples
18%
Plant Application
17%
Hypothesis Testing
16%
Sampling Distribution
16%
Numerical Measures
16%
N-policy
16%
Reliable Decision
16%
Server Breakdown
15%
Performance-based
15%
Chinese Postman Problem
15%
Bayesian Approach
14%
Vacation
14%
Manufacturing Yield
14%
Capability-based
13%
Process Loss
13%
Nonconformity
13%
Yield Estimation
13%
Product Acceptance Determination
13%
Due Date
13%
Manufacturing Line
13%
Control Chart
13%
Performance Measures
13%
Bootstrap Method
12%
Wafer Probe
12%
Quality Assurance
12%
Engineering
Process Capability Index
88%
Process Capability
58%
Process Performance
46%
Manufacturing Process
42%
Process Yield
33%
Illustrates
32%
Liquid Crystal Display
23%
Fits and Tolerances
23%
Applicability
22%
Product Type
21%
Integrated Circuit
19%
Product Quality
17%
Setup Time
15%
Statistical Property
15%
Control Charts
15%
Industrial Park
14%
Sample Data
14%
Real World Application
13%
Bayesian Approach
12%
Performance Analysis
12%
Thin-Film Transistor
12%
Processing Time
12%
Multiple Sample
12%
Step Procedure
11%
Measurement Error
11%
Product Mix
10%
Sampling Error
10%
Nonconformity
10%
Normal Distribution
9%
Sampling Plan
9%
Quality Characteristic
9%
Selection Procedure
9%
Bootstrap Method
9%
Semiconductor Manufacturing
9%
Real Application
9%
Optical Lithography
7%
Test Statistic
7%
Collected Data
7%
Confidence Interval
7%
Manufacturing Quality
7%
Portable Device
6%
Quality Control
6%
Quality Level
6%
Confidence Level
6%
Microelectronics
6%
Process Lines
6%
Compressed Air Motors
6%
Shop Floor
5%
Design and Environment
5%
Programming Model
5%
Mathematics
Lower Confidence Bound
38%
Statistical Property
35%
Queueing System
35%
Probability Theory
28%
Product Type
26%
Statistical Hypothesis Testing
25%
Asymmetric
25%
Sampling Distribution
21%
Gaussian Distribution
20%
Variance
18%
Performance Measure
17%
Estimated Process
16%
Approximates
16%
Service Time
15%
Bootstrap Method
14%
Actual Data
13%
Unit Time
13%
Defectives
13%
Bayesian
13%
Step Procedure
13%
Asymptotic Distribution
12%
Unbiased Estimator
12%
Numerical Example
12%
Confidence Level
11%
Maximum Entropy
11%
Estimating Process
11%
Exact Approach
10%
Bayesian Approach
10%
Cost Function
10%
Non-Normal Distribution
9%
Service Channel
9%
Characteristic System
9%
Powerful Test
8%
mean shift
8%
Testing Procedure
8%
Probability Density Function
8%
Test Statistic
8%
Customer Arrives
7%
Busy Period
7%
System Size
7%
Minimizes
7%
Polynomial Time
7%
Confidence Interval
7%
Infinite Capacity
7%
State Probability
7%
Simulation Study
6%
Sample Data
6%
Mean Square Error
6%
Heuristic Algorithm
6%
Probability Distribution
6%