Wei-Chih Wang

Professor

Calculated based on number of publications stored in Pure and citations from Scopus
Calculated based on number of publications stored in Pure and citations from Scopus
Calculated based on number of publications stored in Pure and citations from Scopus
20002024

Research activity per year

Filter
Conference contribution

Search results

  • 2024

    Unveiling Building Façade Deterioration: A Drone-Powered Deep Learning Approach for Seamless Tile Peeling Detection

    Nguyen, N. M., Cao, M. T. & Wang, W. C., 2024, Proceedings of the 41st International Symposium on Automation and Robotics in Construction, ISARC 2024. International Association for Automation and Robotics in Construction (IAARC), p. 784-791 8 p. (Proceedings of the International Symposium on Automation and Robotics in Construction).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

  • 2015

    Establishing construction scheduling progress curve based on buidling information modeling quantity takeoffs

    Wang, K. C., Wu, W. H., Hsu, P. Y., Gansonre, A. A., Wang, W.-C. & Kung, C. J., 2015, ICSOFT-EA 2015 - 10th International Conference on Software Engineering and Applications, Proceedings; Part of 10th International Joint Conference on Software Technologies, ICSOFT 2015. Lorenz, P., Maciaszek, L. & Maciaszek, L. (eds.). SciTePress, p. 139-144 6 p. (ICSOFT-EA 2015 - 10th International Conference on Software Engineering and Applications, Proceedings; Part of 10th International Joint Conference on Software Technologies, ICSOFT 2015).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

  • 2014

    Application of building information modeling in designing fire evacuation-a case study

    Wang, K. C., Shih, S. Y., Chan, W. S., Wang, W.-C., Wang, S. H., Gansonre, A. A., Liu, J. J., Lee, M. T., Cheng, Y. Y. & Yeh, M. F., Jul 2014, 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. Ha, Q., Akbarnezhad, A. & Shen, X. (eds.). University of Technology Sydney, p. 593-601 9 p. (31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    22 Scopus citations
  • Developing an ontology-based representation framework for establishing cost analysis knowledge base for construction work items

    Wang, H. H., Weng, S. W., Gansonre, A. A. & Wang, W.-C., Jul 2014, 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. Ha, Q., Akbarnezhad, A. & Shen, X. (eds.). University of Technology Sydney, p. 377-384 8 p. (31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    2 Scopus citations
  • Model for evaluating uncertain project duration considering construction interface problems

    Wang, S. H., Lai, Y. T., Liu, J. J. & Wang, W.-C., 1 Jan 2014, Applied Science and Precision Engineering Innovation. p. 1160-1169 10 p. (Applied Mechanics and Materials; vol. 479-480).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

  • 2008

    Evaluating the effect of multiple factors on unit prices for supporting bid price decisions

    Wang, W.-C., Hsu, C. H., Wang, S. S. & Lin, C. C., 1 Dec 2008, Proceedings of the 6th International Conference on Engineering Computational Technology. (Proceedings of the 6th International Conference on Engineering Computational Technology).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

  • 2007

    Scheduling model for multiple design projects considering uncertain design iterations

    Wang, W.-C. & Liu, J. J., 2007, Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction. p. 447-452 6 p. (Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    1 Scopus citations
  • 2005

    Bid-price determination considering cash-flow effects

    Wang, W.-C., Lin, C. L. & Lu, Y. H., Aug 2005, Proceedings of the 10th International Conference on Civil, Structural and Environmental Engineering Computing, Civil-Comp 2005. 15 p. (Proceedings of the 10th International Conference on Civil, Structural and Environmental Engineering Computing, Civil-Comp 2005).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    1 Scopus citations